ANALISIS RISIKO TERHADAP WAKTU PELAKSANAAN PEMBANGUNAN PERUMAHAN DI KOTA DENPASAR

  • Ida Bagus Gde Manuaba Fakultas Teknik Universitas Dwijendra

Abstract

Implementation of housing projects in the city of Denpasar are common things  that are not in accordance with the plan, which is one of them is the uncertainty of timing issues in the field of project implementation. lack of risk uncertainty at this stage of project implementation time depends on the coordination and control of all stakeholders including the project owner that takes skill, knowledge and experience for the party - related party. Therefore, to control the factors causing uncertainty in identifying the need and the comprehensive risk analysis, so the possibility of bad risks arising darai be pressed / in minimalism.Research methods in identifying the risks is a way of brainstorming and interviews as well as distributing questionnaires to the parties - the profession of housing associations, contractors and project owners after the conducted an assessment of the risks - risks identified a risk that the dominant (major risk), the risk category is unacceptable (Unacceptable) and the risk of unexpected (Undesirable), further mitigation measures / handling to minimize the harmful effects of these risk .The results obtained risks - risks identified are as many as 51 (fifty one) risks involved in the implementation of housing projects. After an assessment at the level of acceptance of risk (risk acceptability) generate risk the category is not acceptable (unacceptable) there are 2 (two) risk (3.92%), and the risk of unintended (undesirable) there are 49 (forty nine) risk (96.08%). the category of acceptable (acceptable) and there is no risk in Gori said negligible (negligible) also there is no risk. Data processing is performed statistical diskriptip assisted by using SPSS software version 17 and Microsoft Excel.Comparison of risk that is not expected (Undesirable) consists of 4 (four) risk (8.16%) sourced from the political risk, one (1) risk (2.04%) of the environmental risk, 3 (three) risk (6.12%) of risk perncanaan, 1 (one) risk (2.04) of marketing ridiko, 3 (three) risk (6.12%) of economic risk, 1 (one) risk (2.04) of financial ridiko, 3 (three) risk (6.12%) of the natural risk, 12 (twelve) risk (24.49%) of project risk, 2 (two) risk (4.08%) of the technical risk, 16 (sixteen) risk (32.65) of human risk, 1 (one) risk (2.04) of criminal risk, 2 (two) risk (4.08%) of the safety risk. The most dominant (major risk) rooted in human risk is: execution of work due to the disruption of traditional ceremonies, defects arising from design changes, the amount of wasted materials, methods of implementation proposed by the contractor is less precise, method of taking a job working in a less supportive, organization's internal strife contractor, owner familiar with the different contractors, different culture / cultural influences between the labor and material changes from the owner. Keywords: time risk, risk identification, assessment, mitigation.

References

Abbas Salim. 2005. Asuransi Dan Manajemen Risiko. Jakarta: PT Raja Grafindo Persada

Asiyanto. 2005. Manajemen Produksi Untuk Jasa Konstruksi. Jakarta: PT Pradnya Paramita

Bramantyo Djohanputro. 2004. Manajemen risiko Korporat Terintegrasi. Jakarta: PPM

Eriyanto. 2007. Teknik Sampling Analisis Opini Publik. Yogyakarta: PT LKIS Pelangi Aksara

Flanagan, R, Norma, G.1993. Risk Management And Construction. Cambridg: University Press

Godfrey, P. S. 1996. Control of Risk. A Guide to the Systematic Management of Risk from Construction Engeneering and management (Desember 1995). 422-429

Hinsa Siahaan. 2007. Manajemen Risiko. Jakarta: PT Elex Media Komputindo

Herman Darmawi. 2006. Manajemen Risiko. Jakarta: Bumi Aksara

Harold Kerzner, Ph.D, 1995, Project Management, A System Approach to Planning,Scheduling, and Controlling, Van Nostrand Reinhold, An International Thomson Publishing Company.

Iman Ghozali. 2005. Aplikasi Analisi Multivariat Dengan Program SPSS. Semarang: Universitas Diponegoro.

Muhammad Muslich. 2007. Manajemen Risiko Operasional. Jakarta: Sinar Grafika Offset

Mahendra Sultan Syah. 2004. Manajemen Proyek (Kiat Sukses Mengelola Proyek). Jakarta: PT Gramedia Pustaka Utama

Rayadi, A. T. 2003. kajian Aspek Risiko Kegagalan Bangunan Pada Kelayakan Proyek Privatisasi Infrastruktur. Bandung: Institut Teknologi Bandung

Sofyan, I. 2005,Manajemen Risiko, Graha Ilmu, Yogyakarta.

Published
2017-06-06
How to Cite
[1]
Manuaba, I.B.G. 2017. ANALISIS RISIKO TERHADAP WAKTU PELAKSANAAN PEMBANGUNAN PERUMAHAN DI KOTA DENPASAR. Jurnal Anala. 2, 2 (Jun. 2017). DOI:https://doi.org/10.46650/anala.2.2.184.%p.
Section
Articles

Most read articles by the same author(s)